Inventory and Replenishment
Stock position across ten branches and three warehouses, with transfers evaluated before purchases.
Comparison
Snapshot 17 Aug 2026
Snapshot 17 Aug 2026
Stock cover
iKLCCMid ValleyPuchongGeorgetownIpohJohor BahruMelaka CityKuantanKuchingKota KinabaluSK-001
14
5
7
7
9
5
6
13
14
5
SK-00212
6
8
8
12
23
7
4
5
3
SK-00315
7
15
6
6
9
12
6
18
11
SK-00413
9
4
8
7
32
7
10
15
4
SK-00511
7
17
10
68
7
18
19
12
15
At risk — below its own lead timeTightHealthyExcess — above 45 days
Stock-out risk
iSK-002Kota Kinabalu, SabahCritical
Cover 3.4 daysLead 21 days20.0 units/dayOut 20 Aug 2026
SK-002Kuantan, PahangCritical
Cover 3.6 daysLead 9 days17.4 units/dayOut 20 Aug 2026
SK-004Kota Kinabalu, SabahCritical
Cover 3.7 daysLead 21 days7.9 units/dayOut 20 Aug 2026
SK-002Central Distribution CentreCritical
Cover 3.9 daysLead 9 days189.3 units/dayOut 20 Aug 2026
SK-003Southern Distribution CentreCritical
Cover 5.0 daysLead 11 days25.1 units/dayOut 21 Aug 2026
SK-002Kuching, SarawakCritical
Cover 5.4 daysLead 21 days16.1 units/dayOut 22 Aug 2026
Excess stock
iSK-005Central Distribution CentreMYR 236,248
Cover 96 days4,011 usable unitsSurplus above safety stock 3,806
Reallocating is cheaper than reordering.
SK-005Ipoh, PerakMYR 19,732
Cover 68 days335 usable unitsSurplus above safety stock 322
Reallocating is cheaper than reordering.
Recommended transfers
iTRF-2207SK-002Proposed
KLCC, Kuala Lumpur → Kota Kinabalu, Sabah
Cover 3.4 days against a 21-day replenishment lead time
86 units
arrives 25 Aug 2026
TRF-2208SK-002Proposed
KLCC, Kuala Lumpur → Kuantan, Pahang
Cover 3.6 days against a 9-day replenishment lead time
170 units
arrives 23 Aug 2026
TRF-2209SK-004Proposed
KLCC, Kuala Lumpur → Kota Kinabalu, Sabah
Cover 3.7 days against a 21-day replenishment lead time
70 units
arrives 25 Aug 2026
TRF-2210SK-002Proposed
KLCC, Kuala Lumpur → Kuching, Sarawak
Cover 5.4 days against a 21-day replenishment lead time
86 units
arrives 25 Aug 2026
TRF-2211SK-005Proposed
Central Distribution Centre → Mid Valley, Kuala Lumpur
Excess at Central Distribution Centre: 96 days of cover, MYR 236,248 tied up. Reallocating is cheaper than reordering.
79 units
arrives 21 Aug 2026
TRF-2212SK-005Proposed
Central Distribution Centre → Johor Bahru, Johor
Excess at Central Distribution Centre: 96 days of cover, MYR 236,248 tied up. Reallocating is cheaper than reordering.
61 units
arrives 21 Aug 2026
TRF-2213SK-005Proposed
Ipoh, Perak → Mid Valley, Kuala Lumpur
Excess at Ipoh, Perak: 68 days of cover, MYR 19,732 tied up. Reallocating is cheaper than reordering.
79 units
arrives 22 Aug 2026
TRF-2214SK-005Proposed
Ipoh, Perak → Johor Bahru, Johor
Excess at Ipoh, Perak: 68 days of cover, MYR 19,732 tied up. Reallocating is cheaper than reordering.
61 units
arrives 22 Aug 2026
692 units can be moved rather than bought. The residual 852 units that no donor can cover is what the purchase draft is for.
Inbound purchase orders
iPO-4462SK-002Central Distribution Centre960 unitsarrives 20 Aug 2026Confirmed
PO-4465SK-001Central Distribution Centre1,440 unitsarrives 23 Aug 2026Confirmed
PO-4468SK-004Southern Distribution Centre720 unitsarrives 26 Aug 2026Confirmed
PO-4470SK-002East Malaysia Distribution Centre480 unitsarrives 29 Aug 2026Confirmed